Industries & Sectors – Computing for Research

Science: Computing power for Research

Simulations, data analysis and research data management – with GPU and CPU processing power booked on a per-project basis, rather than spending years on grant applications.

Why centron

Infrastructure for projects rather than applications

Research is project-based – computing power should be too.

GPU for computations

Simulations and machine learning analyses run on dedicated GPUs from €92.59 per month (billed by the hour) – booked for the duration of the project and charged to third-party funding.

FAIR research data

S3 Object Storage makes datasets available in versioned and citable formats – from raw data to publication supplements.

Clusters as required

Scaling batch jobs in Kubernetes – large parameter studies result in a large number of nodes, after which the cluster shrinks to zero.

Data Protection for Studies

Personal research data remains in German, C5-certified data centres – compliant with ethics committee requirements.

From a laptop to a cluster

Reproducible research on reproducible infrastructure

Analyses are carried out in Jupyter on a VM, scaled as container jobs in Kubernetes, and the results – along with the environment – are archived in S3; every publication remains traceable. Project-specific billing provides quotas and cReports for the management of third-party funding.

projektgenauhourly-based · ideal for externally funded projects
Calculate costs using the price calculator
  • Interactive – Jupyter & RStudio on VMs
  • Batch processing – Kubernetes for parametric studies
  • Data Archive – S3 versioned and citable
  • Suitable for third-party funding – Costs per project
Recommended modules

The right centron products

Customers typically implement this use case using these building blocks – which can be combined and expanded at any time.

Cloud GPU
Ab
92,59 € / Monat
NVIDIA performance
  • RTX A4000 from €92.59 per month
  • Dedicated, not shared
  • No minimum term
Kubernetes
Ab
29,99 € / Monat
Container orchestration
  • AutoScaler included
  • Traffic at a fixed price
  • CI/CD-ready
S3 Object Storage
Ab
5,00 € / Monat
Scalable storage
  • S3-compatible API
  • Free traffic
  • Unlimited scalability
In a nutshell

Which cloud infrastructure is best suited to the scientific community?

Cloud for science: computing clusters, GPU nodes and storage for research projects – flexible, eligible for funding, based in Germany. The core component is Cloud GPU, starting from €92.59 per month – billed by the hour, with no minimum contract term. This is supplemented, as required, by Kubernetes and S3 Object Storage. The service is hosted in compliance with the GDPR in centron’s own certified to ISO 27001 on the basis of IT-Grundschutz data centres, which hold BSI C5:2020 Type 1 certification. New accounts receive a €200 starting credit.

Packages and prices
Building blockPrice
Cloud GPUfrom €92.59 per month
Kubernetesfrom €29.99 per month
S3 Object Storagefrom €5.00 per month
Industries & Sectors FAQ

Frequently Asked Questions

Is this cost-recovery model suitable for externally funded projects?

Excellent: Resources are billed by the hour for each project, quotas strictly limit budgets, and cReports provides the expenditure reports detailing how funds have been used – without any long-term commitment extending beyond the project duration.

How much does it cost to get started?

The starting prices are deliberately low: Cloud GPU from €92.59 per month, Kubernetes from €29.99 per month and S3 Object Storage from €5.00 per month. New accounts receive €200 in starting credit for 60 days – you can calculate the cost of your specific configuration transparently using the price calculator.

Can this be implemented in a way that complies with the GDPR?

Yes. In research, data relating to participants and studies often falls within the special categories set out in Article 9 of the GDPR; in addition, there are requirements from the ethics committee and funding bodies regarding the location of data storage. With centron, this data remains in Germany, under a data processing agreement in accordance with Article 28 of the GDPR. The data centres are certified to ISO 27001 on the basis of IT-Grundschutz; for ccloud³ / Managed Cloud there is an unrestricted BSI C5:2020 Type 1 attestation. Details can be found in the Trust Centre.
Read more

More on Industry & Research

Get started for free

Sign up and receive €200 credit at centron within your first 60 days.

This promotional offer applies to new accounts only. Available exclusively to businesses.

Jetzt loslegen Sales kontaktieren